Last November, I attended a meeting in Toronto. I tried the bus+train option,
and ran into a similar construction closure and shuttle workaround. The closed
section of subway was several stops and so the shuttle had several stops to
make before it reached the working end of the subway. It took more than two
hours to get from the airport to my stop downtown.
This time, it looks like the outage is just one subway hop, so the shuttle
should be pt-pt, so maybe not as bad. But still.
And if you are looking to this option as a way to avoid rush hour on the
expressway, you might want to consider that the 15 minutes on the bus is on the
expressway.
--Sandy
On Jul 14, 2014, at 12:08 PM, Carsten Bormann <cabo(_at_)tzi(_dot_)org> wrote:
On 14 Jul 2014, at 17:05, Russell Sutherland
<russell(_dot_)sutherland(_at_)utoronto(_dot_)ca> wrote:
Kipling station
Oh.
https://www.ttc.ca/Service_Advisories/Route_diversions/Line_2_Kipling_to_Islington.jsp
(I’m arriving before that happens, but prepare for more baggage schlepping if
you arrive on the weekend.)
Grüße, Carsten
_______________________________________________
90attendees mailing list
90attendees(_at_)ietf(_dot_)org
https://www.ietf.org/mailman/listinfo/90attendees
signature.asc
Description: Message signed with OpenPGP using GPGMail