The log of major changes is quoted below. The latest snapshot,
including XML sources for those doing hands-on modifications, is
available at
http://www.measurement-factory.com/tmp/opes/
Please continue to comment and work on the to-do list.
Thank you,
Alex.
-------------- change log ----------------
head-sid9
* Added Negotiation and Capability Inquiry sections
* Deleted data-end message because AME (Application Message End)
already does the same thing and because there is no data-start
message.
* Deleted meta-* messages. Data-* messages are now used for both
metadata and data since OCP does not know the difference, but
must provide the same exchange mechanism for both.
* Use a single message name (short or long, depending on the
message) instead of using full and abbreviated versions and
trying to enforce abbreviations on the wire. Be more consistent
in creating short message names.
* Resurrected OCP scope figure based on popular demand.
* Applied Martin Stecher comments dated 2003/05/30.