RE: Gen-art LC review: draft-mm-netconf-time-capability-05

2015-08-04 11:19:57
Hi Robert,

Thanks for the comments.


A typical example of using near-future scheduling is a coordinated commit; 
a client needs to trigger a commit at n servers, so that the n servers 
perform 
the commit as close as possible to simultaneously. Without the time 
capability, 
the client sends a sequence of n commit messages, and thus each server 
performs the commit at a different time. By using the time capability, the 
client 
can send commit messages that are scheduled to take place at time Ts, which 
is 5 seconds in the future, causing the servers to invoke the commit as close 
as 
possible to time Ts.

I'm interested in your response to Andy's point on this paragraph.

Okay, so here is Andy's point:

You should pick a different example because the NETCONF confirmed-commit
procedure is designed to be loose-coupled.  The default timeout is 10 minutes.
Since the client needs sessions open with all servers involved in the 
network-wide
commit, there is no advantage in staging the <commit> operations 15 sec. in 
advance,
to make sure the servers are reachable.

And here is our response from 02-Aug-2015:

Right, confirmed-commit is loose-coupled. But the example quoted above 
(Example 
1 in the draft) is not intended to replace the confirmed commit. The purpose 
in this 
example is different: the client wants the commit RPCs to be executed at the 
same 
time in all servers.
The confirmed-commit serves a different purpose, which is to make sure that 
everyone 
either commits or rolls back. BTW, a confirmed commit can be sent with the 
scheduled-time 
element, allowing to enjoy the best of both worlds.


Please let us know if you have further concerns about this point.


The default value of sched-max-future is defined to be 15 seconds. This 
duration 
is long enough to allow the scheduled RPC to be sent by the client, 
potentially to 
multiple servers, and in some cases to send a cancellation message, as 
described 
in Section ‎3.2. On the other hand, the 15 second duration yields a very low 
probability 
of a reboot or a permission change.

I'm not finding the explanation terribly persuasive, but it's at least 
_some_ explanation - thanks for that.  I'll leave it to the ADs and 
other reviewers in the field to see if it's sufficient for an 
experimental protocol.

(*) Please see comment (**) below.

Note that we did not define a maximal value for sched-max-future, since one 
of the goals was to define a generic tool that can be used for various 
different 
environments. The draft clearly states the intention of using 
near-future-scheduling, 
but the requirements and constraints of different environments may require 
the 
sched-max-future to have a different value, potentially higher than 30 
seconds. Hence, 
we prefer not to define a maximal value. Indeed, in the draft 06 there is a 
more detailed 
discussion about the issues we are trying to prevent by using near-future 
scheduling (Section 3.6).

Without a maximal value, I think you need more of a discussion guiding 
the choice of sched-max-future. Otherwise, you are just waiving your 
hands at not addressing the problems with far-future scheduling, and 
potentially well-meaning but uninformed people are going to go step in 
them anyway. There was a point to choosing the near-future limit. 
Enforce it or explain it with more vigor please.

(**) Your point is well taken. What we suggest, regarding this point and the 
previous point (*), is that we add more text explaining the factors that affect 
sched-max-future to Section 3.6 .

Here is the new text we suggest. Please let us know if this addresses your 
comment:


The challenge in far future scheduling is that during the long period between 
the time at which the RPC is sent and the time at which it is scheduled to be 
executed the following erroneous events may occur:
- The server may restart.
- The client's authorization level may be changed.
- The client may restart and send a conflicting RPC.
- A different client may send a conflicting RPC.

In these cases if the server performs the scheduled operation it may perform an 
action that is inconsistent with the current network policy, or inconsistent 
with the currently active clients.

Near future scheduling guarantees that external events such as the examples 
above have a low probability of occurring during the sched-max-future period, 
and even when they do, the period of inconsistency is limited to 
sched-max-future, which is a short period of time.

Hence, sched-max-future should be configured to a value that is high enough to 
allow the client to:
1. Send the scheduled RPC, potentially to multiple servers.
2. Receive notifications or rpc-error messages from the server(s), or wait for 
a timeout and decide that if no response has arrive then something is wrong.
3. If necessary, send a cancellation message, potentially to multiple servers.

On the other hand, sched-max-future should be configured to a value that is low 
enough to allow a low probability of the erroneous events above, typically on 
the order of a few seconds. Note that even if sched-max-future is configured to 
a low value, it is still possible (with a low probability) that an erroneous 
event will occur. However, this short potentially hazardous period is not 
significantly worse than in conventional (unscheduled) RPCs, as even a 
conventional RPC may in some cases be executed a few seconds after it was sent 
by the client.

The default value of sched-max-future is defined to be 15 seconds. This 
duration is long enough to allow the scheduled RPC to be sent by the client, 
potentially to multiple servers, and in some cases to send a cancellation 
message, as described in Section ‎3.2. On the other hand, the 15 second 
duration yields a very low probability of a reboot or a permission change.


This YANG module defines the <cancel-schedule> RPC. This RPC may 
be considered sensitive or vulnerable in some network environments. 
Since the value of the <schedule-id> is known to all the clients that are 
subscribed to notifications from the server, the <cancel-schedule> RPC 
may be used maliciously to attack servers by canceling their pending RPCs. 
This attack is addressed in two layers: (i) security at the transport layer, 
limiting the attack only to clients that have successfully initiated a secure 
session with the server, and (ii) the authorization level required to cancel 
an RPC should be the same as the level required to schedule it.

To help me along, point me to the specifics of what you use to set and 
verify such an authorization level?

Indeed, there is a need for an authorization scheme, which is able to set and 
verify the authorization level.
NETCONF (RFC 6241) does not explicitly define an authorization scheme, and it 
is probably not within the scope of the current draft to define such a scheme 
either.
Quoting RFC 6241:

   This document does not specify an authorization scheme, as such a
   scheme will likely be tied to a meta-data model or a data model.
   Implementors SHOULD provide a comprehensive authorization scheme with
   NETCONF.
   ...
   Different environments may well allow different rights prior to and
   then after authentication.  Thus, an authorization model is not
   specified in this document.  When an operation is not properly
   authorized, a simple "access denied" is sufficient. 



Please let us know if you have further comments or concerns about any of the 
issues above.

Thanks,
Tal.