wayne wrote:
Adding a change long probably won't push it past 95%
The change log is for the IETF "last call" and the IESG
review. It will be removed by the RfC editor See e.g.
appendix B in draft-lilly-field-specification-03
/me goes off to look for stuff to cut out of the spec.
You have twenty seconds. <eg>